MLS Field Heating

Foxborough, MA, USA – 

Snow Melting for Soccer

The New England Revolution’s new $35 million training facility behind Gillette Stadium in Foxborough, MA trusts aquatechnik to keep their outdoor pitch free of snow.

This project required 4″ and 6″ aquatechnik PP-RCT 125 pipes, which were prefabricated to save the contractor precious time during installation at the field. Fused into the pre-made headers are 640 outlets with a reverse return set-up with three zones that connect to the boiler room 650 feet away.

The boiler room is an impressive 15 million BTUs of power to heat the field. The Revolution soccer club is not only extremely satisfied with the performance of the system, but impressed with the the efficiency too.